I have been working downstairs pretty much a little every day but it doesn’t look like I have a lot to show for it! I am continuing to work on Luke’s room. He picked out flooring at Lowe’s and we bought enough to do his whole room and closet. First I have to finish all the painting and trim. So far I’ve painted the ceiling black (of course) and framed in the 2 sets of pipes (finally). I also finished building a small closet to hide the electric panel. Now I am trying to build a small bookcase to hide the fireplace. Additionally I am stripping the paint off the old bathroom door. I want to take it back to it’s natural wood finish and use it for Luke’s room.

As a small side project I did use some of the strips of 1/4″ plywood to do a board and batten pattern on the wall outside the bathroom. I am going to put some hooks up on the horizontal piece. We can hang our winter coats or rain gear here before going upstairs.

Thanks for visiting our site! Want to be notified of new posts? Please leave your email below.

Your email address will not be published. Required fields are marked *